Four rooftop units replaced in one day at a busy plaza
Four package rooftop units that had become a problem, disconnected, removed, replaced and back up and running the same day.
The job
- The site
- A busy commercial plaza
- What was there
- Four package rooftop units that had become a problem
- What we did
- Disconnected, removed and replaced all four
- How long
- One day, back up and running the same day
- The result
- Minimal disruption to the plaza
Photos from the job
How it went
What was there
A busy plaza had four package rooftop units that had become a problem.
What we did
We disconnected all four, removed them and replaced them with new units.
The result
All four were back up and running the same day, with minimal disruption to the plaza.
About package rooftop units
A package rooftop unit puts the whole system in one cabinet on the roof: compressor, coils, fans and controls.
Replacing one takes a crane lift, and the space it serves has no heating or cooling from it until the new unit is connected and started.
Planning a rooftop unit replacement?
Tell us about the units and the building through the contact form. We reply within 24 hours. If a unit has already quit, call the shop on 250-797-2829.